PV Carbon Steel Solar Ground Adjustable Mounting Frame Pole Brackets Steel Structure

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Product Information
Certification
Certificate of Utility Model Patent
Application
Commercial
Material
Steel
Type
Ground Bracket
Product Name
Ground Screw
Surface Treatment
Anodizing 13 Um
Max Wind Speed
up To 130mph (60m/S)
Design Snow Load
up to 30PSF (1.4kN/M2)
Design Standard
JIS C 8955:2011, GB50009-2012
Panel Direction
Vertical or Landscape
Installation
Tin Rooftop or Flat Concrete
Duration
25 Years
HS Code
7610900000
Capacity
50gw / Month
Solar Ground Mounting
Technical Parameters
Technical Specifications
Product NameGround screw
KeywordsGround screw solar mount
MaterialAluminum 6005-T5 & SUS304 Galvanized steel
Surface TreatmentGalvanizing
Tilt Angle10°-15°; 15°-30°; 30°-60°
Max Wind SpeedUp To 130Mph (60m/s)
Design Snow LoadUp To 30Psf (1.4kn/m2)
Design StandardJIS C 8955:2011, GB50009-2012, 1BC 2009
Panel DirectionVertical Or Landscape
InstallationTin Rooftop Or Flat Concrete Open Space
ApplicationCompatible With Almost Market Panels
Warranty12 Years
Duration25 Years
Product Description
Galvanized steel solar panel mounting system

Galvanized steel solar panel mounting system

Solar ground mounting system is manufactured in zinc-mg-aluminum steel plates and can be used in a variety of conditions using concrete foundations and ground screws for different panel arrays. Using zinc magnesium aluminum steel structure, this solar mount type has significant advantages.

  • 100% high strength zinc magnesium aluminum steel plate with excellent corrosion resistance.
  • High competitiveness on material costs.
  • Easy and fast installation with unique design.
  • Environmental protection and long service life.
  • The coating weight is less, and the simplified process eliminates hot dip plating after forming.
Key Features
  • Compatibility With All Types Of Structures - Foundation Solution Concrete Free.
  • Surrounding Areas Remain Unspoiled.
  • Easy Remove, Simple And Easy To Relocate.
Detailed Photos & Projects
800kw Metal Rooftop (Mexico)
2MW L Feet System (Sri Lanka)
24KW Tile Rooftop (Poland)
4MW Roof Clamps (Myanmar)
Concrete Rooftop (South Africa)
Ground Solar Mount (Japan)
Packaging & Shipping
Frequently Asked Questions (FAQ)
Are you a factory or trading company?
We are a direct manufacturer in China specializing in solar mounting systems for roof, ground, RV, and more.
What is the expected production time?
In-stock items take 1-3 days, while mass production typically requires 7-15 days depending on the order quantity.
Is there a minimum order quantity (MOQ)?
We do not have an MOQ for current products. However, ODM and OEM items may require a minimum quantity due to technical and material reasons.
Can I request a sample?
Yes, similar samples from our showroom are free (freight not included). Customized samples require a charge. We welcome testing of our quality.
How are the goods shipped and how long does it take?
Sample orders are shipped via DHL/FedEx (3-5 days). Large orders are generally shipped by sea, taking 15-30 days depending on the destination port.
What customization services do you provide?
We provide full OEM and ODM services, including customized logos, colors, and specialized packaging based on your requirements.

Related Products